Project: Manufacture of LPG (Liquified Petroleum Gas) by blending Propane & Butane.

Plant : LPG MANUFACTURING & BOTTLING PLANT

 
 
 
       
   

INTRODUTION

M/S LEADER GAS & PETROCHEM LTD. proposes the activity of Propane & Butane, unloading and manufacturing LPG.
       
   

iSR.NO.

iEQUIP. CODE

iEQUIP. NAME

iCAPACITY
i( WATER CAPACITY)

iQUANTITY

1

T-1

iLPG STORAGE

42.5  m3

1

2

T-2

iBUTANE STORAGE

42.5  m3

1

3

T-3

iMIXING TANK

40.0  m3

1

4

T-4

iPROPANE

40.0  m3

1

       
   

iSR.NO.

iEQUIP.CODE

iEQUIP. NAME

iQUANTITY

iTYPE

iCAPACITY ii(CUM/hr.)

iHEAD m

1

P-1

iFILLING PUMP

1

CENTRIFUGAL

15

80

2

P-2

iRECIRCULATION PUMP

1

CENTRIFUGAL

20

80

3

P-3

iTRANSFER/UNLOADING iPUMP

1

CENTRIFUGAL

15

80

4

C-1

iUNLOADING
COMPRESSOR

1

fffghgf

ghdgg

fghg

5 AC-1 AIR COMPRESSOR 1   15.7 CFM  
6 AC-2 AIR COMPRESSOR 1   20 CFM  
         